Resource center

Plan the work. Verify the details. Execute with confidence.

Practical planning tools and industry education for owners, project partners, and stakeholders evaluating well closure and environmental work.

Engineering planningField readinessTechnical closeout

Essential concepts

Suspension is not abandonment

A suspended well is secured and monitored for possible reactivation or future closure. Permanent abandonment uses approved barriers to isolate subsurface zones and is followed by surface closure and reclamation work.

Why tubing and equipment matter

Tubing, rods, pumps, packers, prior devices, and wellhead equipment can affect access to the required isolation depths. The approved program determines what must be recovered, drilled out, repaired, or worked around.

Remediation and reclamation are different

Remediation addresses contamination or environmental impacts. Reclamation restores the land toward its intended condition through infrastructure removal, backfilling, contouring, soil handling, and revegetation.

Verification completes the technical story

Pressure tests, logging, monitoring, tagging, cement placement records, returns, and other approved evidence demonstrate whether the installed barriers achieved the program objective.

Explore the complete well lifecycle

Outside educational videos

Learn from Canadian energy regulators.

The following videos are embedded from official regulator channels for education. They are not Grindstone productions or project footage.

Well Decommissioning Practices Webinar

Source: British Columbia Energy Regulator

Abandoned and Orphaned Wells

Source: Alberta Energy Regulator

Availability, player behavior, and content are controlled by the original publishers and YouTube.