Suspension is not abandonment
A suspended well is secured and monitored for possible reactivation or future closure. Permanent abandonment uses approved barriers to isolate subsurface zones and is followed by surface closure and reclamation work.
Resource center
Practical planning tools and industry education for owners, project partners, and stakeholders evaluating well closure and environmental work.
Downloadable tools
Services, cumulative team experience, project profiles, partnership approach, and contacts in a printer-ready PDF.
Download PDFA practical checklist covering records, field conditions, equipment, environment, engineering, execution, and closeout.
Download PDFEssential concepts
A suspended well is secured and monitored for possible reactivation or future closure. Permanent abandonment uses approved barriers to isolate subsurface zones and is followed by surface closure and reclamation work.
Tubing, rods, pumps, packers, prior devices, and wellhead equipment can affect access to the required isolation depths. The approved program determines what must be recovered, drilled out, repaired, or worked around.
Remediation addresses contamination or environmental impacts. Reclamation restores the land toward its intended condition through infrastructure removal, backfilling, contouring, soil handling, and revegetation.
Pressure tests, logging, monitoring, tagging, cement placement records, returns, and other approved evidence demonstrate whether the installed barriers achieved the program objective.
Outside educational videos
The following videos are embedded from official regulator channels for education. They are not Grindstone productions or project footage.
Source: British Columbia Energy Regulator
Source: Alberta Energy Regulator
Availability, player behavior, and content are controlled by the original publishers and YouTube.